Public
Ville des Hôpitaux-Neufs
750 000 euros HT / 443 m²
Winner - Delivered in 2021
The new building addresses a refined architectural language following the local architecture. It is subject to a strict order with facades marked by repetitions of the apparent structural framework. The construction in wood frame asserts a contemporaneity without being in opposition with the surrounding buildings. Covered with a four-sided roof, it highlights existing buildings such as the town hall or the church. The choice mainly focused on local materials such as wood and flat tile because they were materials that seemed to us the most in line with the project and the architectural language of the town.